Name Of The Project Construction of New 4 Lane Bridge (2X12.5m wide twin two lane structure) over River Ganga down stream of Farakka Barriage including approaches connecting Farakka Rai ganj Section of NH 34 from KM 290.940 (design Chain age 0.00 km to 296.805 km (design chainage 5.486Km) in the state of West Bengal
Client NHAI
Project Location Farakka
Project Value 52,120 Lakhs
Stipulated Period of Completion 36 Months
Current Status  

 

  

Name Of The Project Demolition Of Existing Old Building And Re-Construction Of New Building For Office And Store Accommodation For Water Front Facility And Slipway At Visakhapatnam
Client MES
Project Location VISAKHAPATNAM
Project Value 719.64 Lakhs
Stipulated Period of Completion 18 Months
Current Status  

 

  

Name Of The Project Construction of Jetty to Semi submersible pontoon (SSP) for Dry Docking of Submarines (Phase-I:On Shore ) at Visakhapatnam
Client DGNP
Project Location VISAKHAPATNAM
Project Value 4696 Lakhs
Stipulated Period of Completion 20 months
Current Status  

 

Name Of The Project Augmentation of Shore Supply at N-4 to N-26 Jetties, Dry Docks, Slipways and Degaussing Bay including associated works at ND(V)
Client Director General Naval Projects, Visakhapatnam
Project Location Visakhapatnam
Project Value 1960 Lakhs
Stipulated Period of Completion 24 Months
Current Status  

 

Name Of The Project Construction of Jetty with Loading Facility at Visakhapatnam
Client Director General Naval Projects, Visakhapatnam
Project Location Visakhapatnam
Project Value 14973 Lakhs
Stipulated Period of Completion 30 Months
Current Status  

  

Name Of The Project Construction Of Coastal Berth At Jn Port, Mumbai
Client JNPT, Mumbai
Project Location Mumbai
Project Value 14332 Lakhs
Stipulated Period of Completion 30 Months
Current Status  

 

  

Name Of The Project Construction of Indoor Sports Arena in MVP Colony abutting to A.S.Raja College Grounds under Smart City
Client GVMC,VISAKHAPATNAM
Project Location VISAKHAPATNAM
Project Value 1990 Lakhs
Stipulated Period of Completion 12 Months
Current Status